20 Fenchurch Street

Plant Moved:    17,500 kgs Water Chillers

 

Delivery of 17.5 tonne Chillers using Container Lift Services to unload kerbside and lower to the basement via the 25,000 kgs lifting beams. The chillers were loaded at our storage facility onto the flat rack containers and collected by the Container Lift vehicle and shipped to site.  Five chillers were delivered to site on the same day and lowered to the basement level ready for positioning.  The unloading time was greatly reduced and the need for a mobile crane was eliminated.