Helicopter Plant Lift – Central London

Plant Movements have completed a two phase lifting operation in central London on the banks of the river Thames.  The replacement of a number of roof top chillers required an alternative method to a traditional crane lift due to the restrictions on the ground level. A Norwegian helicopter was brought for the special lifting operations, the project was planned and manage in conjunction with UK  based company Helirig.