Great Ormond Street Hospital

Plant Moved:  20,000 kgs Back-Up Generators

 

Unloading back-up generators in a road closure and lowering them down a ramp using a winch vehicle.  Metal tracking plates were laid out to give a smooth running surface for the machinery-moving skates. The mobile crane unloaded the generators and landed each set onto skates. The winch vehicle was then attached and the crane released. Each generator set was lowered down the ramp fully controlled by the winch vehicle.